Publish date: 19 August 2021
There will be an interruption to power at Clock View on 25 August 2021 between 5am and 6am.
During this time the ememergency back up generator will run simultaneously during the power shut down period.
Publish date: 19 August 2021
There will be an interruption to power at Clock View on 25 August 2021 between 5am and 6am.
During this time the ememergency back up generator will run simultaneously during the power shut down period.